Unfinished Shaker - WBS18-2

Unfinished Shaker - WBS18-2

$135.98
$98.52
SKU#: US-WBS18-2
QTY
  • Description

    Unfinished Shaker - 14 1/4"W X 17 1/2"H X 21"D With 2 Trash Cans (Each 35 Qt) Waste Basket

  • Additional information

    <div class="w-full flex flex-col"><div class="flex flex-row gap-4 mb-3 last:mb-0"> <div class="text-sm font-semibold text-left flex-shrink-0 min-w-[30%]">Weight</div> <div class="text-sm text-[var(--color-font)] flex-1">19.00</div> </div></div>